of the complication of the Kazakhstan’s NEN scheme
Done by: Shaimuradov
E.S.Research supervisor : Bektemirov A.T.
Solved tasks of anti-emergency control system
Optimization (minimization) of the choice of volumes of calculated data
Ensuring automation of anti-emergency control in any circuit-mode conditions
Maximum use of bandwidth connections
Coordination of A-ecs of the NEN of Kazakhstan with the A-esc of the IPS of the Urals and the IPS of Siberia
2. Transit Kazakhstan-Ural. Section fully loaded during the year. The actual flow in the cross section is formed as the balance of the northern regions of Kazakhstan and the transit flow from the UES of the Urals to the UES of Siberia and back. Allowable overflows are sufficient.
3. Transit Siberia-Kazakhstan. The flow in this section is determined only by the power balance of the UES of Siberia and the allowable flows are sufficient.
4. Kazakhstan section of the 500 kV UES ring of Central Asia. The Kazakh section is determined by the flow of electricity to cover the deficits of South Kazakhstan, but due to the reciprocal flow of power from the Uzbek power system to cover the deficit of the Bishkek energy center, the actual power flows are 100-200 MW
Decentralized APVS
Disadvantages of APVS:
Analysis of existing and prospective modes, sufficiency of permissible power flows in controlled sections of the 500 kV grid of the Unified Energy System of Kazakhstan in normal and repair schemes for 2019