Разделы презентаций


ABB Welcome M Commission & Application

Содержание

Content© ABB Group Overview Main DevicesCommission & WiringGeneral Ruler of InstallationApplication & Solution

Слайды и текст этой презентации

Слайд 1ABB Welcome M Commission & Application
June. 2013 CNDEX
© ABB Group

ABB Welcome M Commission & ApplicationJune. 2013 CNDEX © ABB Group

Слайд 2
Content
© ABB Group
Overview Main Devices
Commission & Wiring
General Ruler

of Installation
Application & Solution

Content© ABB Group Overview Main DevicesCommission & WiringGeneral Ruler of InstallationApplication & Solution

Слайд 3Overview Main Devices
Outdoor Station
© ABB Group
Overview Main Devices
Commission &

Wiring
General Ruler
Application & solution


Outdoor Station
Indoor Station
Guard Unit
System Devices









Overview Main DevicesOutdoor Station© ABB Group Overview Main DevicesCommission & WiringGeneral RulerApplication & solutionOutdoor StationIndoor StationGuard UnitSystem

Слайд 4Overview Main Devices
Indoor Station
© ABB Group
M2200.-.
Audio handset
M2230.-.
4.3” Video handset
M2231.-.
4.3”

Video hands-free
M2233.-.
7” Video hands-free
Overview Main Devices
Commission & Wiring
General Ruler
Application &

solution


Outdoor Station
Indoor Station
Guard Unit
System Devices









Overview Main DevicesIndoor Station© ABB Group M2200.-.Audio handsetM2230.-.4.3” Video handsetM2231.-.4.3” Video hands-freeM2233.-.7” Video hands-freeOverview Main DevicesCommission &

Слайд 5Overview Main Devices
Guard Unit
© ABB Group
M2303
Guard unit
Overview Main Devices
Commission

& Wiring
General Ruler
Application & solution


Outdoor Station
Indoor Station
Guard Unit
System Devices









Overview Main DevicesGuard Unit© ABB Group M2303Guard unitOverview Main DevicesCommission & WiringGeneral RulerApplication & solutionOutdoor StationIndoor StationGuard

Слайд 6Overview Main Devices
System Devices
© ABB Group
M2300
System controller,8U
M2301
Mini-system controller,4U
M2302
Gateway,4U
M2305
Switch actuator
83325/2-500
Outdoor

video distributor
M2304
Video distributor
Overview Main Devices
Commission & Wiring
General Ruler
Application & solution


Outdoor

Station
Indoor Station
Guard Unit
System Devices









Overview Main DevicesSystem Devices© ABB Group M2300System controller,8UM2301Mini-system controller,4UM2302Gateway,4UM2305Switch actuator83325/2-500Outdoor video distributorM2304Video distributorOverview Main DevicesCommission & WiringGeneral

Слайд 7
Content
© ABB Group
Overview Main Devices
Commission & Wiring
General Ruler

of Installation
Application & Solution

Content© ABB Group Overview Main DevicesCommission & WiringGeneral Ruler of InstallationApplication & Solution

Слайд 8Commission & Wiring
Audio Module
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Release the lock (LOCK-GND)

(All locks except magnetic lock)

Local power supply for outdoor station

Camera module

Commission & WiringAudio Module© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 9Commission & Wiring
Audio Module
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



* Door lock release time 1-10s is available for the lock (LOCK-GND);
While for the lock connected with “NC-NO-COM”, the time is fixed as 3s, and it can be set by entering system setting by display module.

Commission & WiringAudio Module© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 10Commission & Wiring
Camera Module
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



CVBS: Composite Video Broadcast Signal

H ± 15°, V ± 15°

Option1:
Camera powers on all time

Option 2:
Camera only powers on when surveiling

Commission & WiringCamera Module© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 11Commission & Wiring
Other modules
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Commission & WiringOther modules© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 12Commission & Wiring
Connect all modules together
© ABB Group

Main Devices
Commission

& Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video

Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Commission & Wiring Connect all modules together© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera

Слайд 13Commission & Wiring
Audio Handset
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



*“Default OS: 1-9 ” can be set when entering system setting.
Details please see user manual.

Commission & WiringAudio Handset© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 14Commission & Wiring
4.3” Video Handset
© ABB Group

Main Devices
Commission &

Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3”

Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Local power supply for indoor station

20-30VDC

Commission & Wiring4.3” Video Handset© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio

Слайд 15Commission & Wiring
4.3” Video Hands-free
© ABB Group
E.g. Address of

indoor station:

Main Devices
Commission & Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other

Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Local power supply for indoor station

20-30VDC

Commission & Wiring4.3” Video Hands-free© ABB Group E.g. Address of indoor station:Main DevicesCommission & WiringGeneral RulerApplication &

Слайд 16Commission & Wiring
7” Video Hands-free
© ABB Group

Main Devices
Commission &

Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3”

Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



*The address of 7” video hands-free can be set from 001-250 when entering system setting.
Details please see user manual.

Commission & Wiring7” Video Hands-free© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio

Слайд 17Commission & Wiring
Guard Unit
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Local power supply for guard unit

20-30VDC

Commission & WiringGuard Unit© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 18Commission & Wiring
System Controller – M2300
© ABB Group

Main Devices
Commission

& Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video

Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Technical Data:
Input: 100~240V(AC)
Output current: 28V(DC), 1.2A
Dimension: 8U

Commission & WiringSystem Controller – M2300© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther

Слайд 19Commission & Wiring
Min-system Controller – M2301
© ABB Group

Main Devices
Commission

& Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video

Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Gateway
Video Distributor
Switch Actuator



Technical Data:
Input: 100~240V(AC)
Output current: 28V(DC), 0.65 A
Dimension: 4U

Commission & WiringMin-system Controller – M2301© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther

Слайд 20Commission & Wiring
Distributor
© ABB Group

Main Devices
Commission & Wiring
General Ruler
Application

& solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7”

Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



Commission & WiringDistributor© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3” Video

Слайд 21Commission & Wiring
Switch Actuator
© ABB Group

Main Devices
Commission & Wiring
General

Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video

Hands-free
7” Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



Working mode is defined as follows:
MODE=00 – Extend Door Bell Mode
MODE=01 – Door opening
MODE=10 – Time relay
MODE=11 – Toggle on/off
Details see user manual.

Commission & WiringSwitch Actuator© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3”

Слайд 22Commission & Wiring
Gateway
© ABB Group

Main Devices
Commission & Wiring
General Ruler
Application

& solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7”

Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



Working mode is defined as follows:
MODE=000 – Building Gateway Mode
MODE=001 – Floor Gateway Mode
MODE=010 – Apartment Gateway Mode
MODE=011 – Auxiliary Power Supply Mode
MODE=100 – Line Amplifier Mode

Commission & WiringGateway© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionAudio ModuleCamera ModuleOther ModulesAudio Handset4.3” Video

Слайд 23Commission & Wiring
Gateway- Scenario 1 for buildings
© ABB Group


Configuration of Gateway:
MODE=000 – Building Gateway Mode
Address = Building No.

(<=60)


Main Devices
Commission & Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



Commission & WiringGateway- Scenario 1 for buildings © ABB Group Configuration of Gateway:MODE=000 – Building Gateway ModeAddress

Слайд 24Commission & Wiring
Gateway- Scenario 2 for floor system
© ABB Group


Building 01
Configuration of Gateway:
MODE=001 – Floor Gateway Mode
Address = Minimum

address of indoor station within this floor. (<=99)
Eg. Address of the gateway of 2nd floor=05, is the starting address of first apartment of 2nd floor:05


Main Devices
Commission & Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



Commission & WiringGateway- Scenario 2 for floor system© ABB Group Building 01Configuration of Gateway:MODE=001 – Floor Gateway

Слайд 25© ABB Group
Commission & Wiring
Gateway – Scenario 3 for

apartment system
Building 01
Configuration of Gateway:
MODE=010 – Apartment Gateway Mode
Address =

Apartment No. (<=99) (Configured as a normal indoor station)


Main Devices
Commission & Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



© ABB Group Commission & WiringGateway – Scenario 3 for apartment systemBuilding 01Configuration of Gateway:MODE=010 – Apartment

Слайд 26© ABB Group
Commission & Wiring
Gateway – Scenario 4 for

auxiliary power supply
Configuration of Gateway:
MODE=011 – Auxiliary power supply

mode
Address = 00

Outdoor station for building 01


Main Devices
Commission & Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



© ABB Group Commission & WiringGateway – Scenario 4 for auxiliary power supply Configuration of Gateway:MODE=011 –

Слайд 27© ABB Group
Commission & Wiring
Gateway – Scenario 5 for

double the distance
Configuration of Gateway:
MODE=100 – Line amplifier mode
Address

= 00


Main Devices
Commission & Wiring
General Ruler
Application & solution


Audio Module
Camera Module
Other Modules
Audio Handset
4.3” Video Handset
4.3” Video Hands-free
7” Video Hands-free
Guard Unit
System Controller
Video Distributor
Switch Actuator
Gateway



© ABB Group Commission & WiringGateway – Scenario 5 for double the distance Configuration of Gateway:MODE=100 –

Слайд 28
Content
© ABB Group
Overview Main Devices
Commission & Wiring
General Ruler

of Installation
Application & Solution

Content© ABB Group Overview Main DevicesCommission & WiringGeneral Ruler of InstallationApplication & Solution

Слайд 29General Ruler For Installation
Rulers for IS — M/S ON/OFF
© ABB

Group
Main Devices
Commission & Wiring
General Ruler
Application & solution


Rulers for IS
Rulers

for multi-buildings
Capacity
Distance









“M/S – ON” or “M/S – OFF” : (master / slave)
Only one indoor station in each apartment must be set as "Master" ('M/S on').
All additional indoor stations in the same apartment must be set as "Slave" ('M/S off').

General Ruler For InstallationRulers for IS — M/S ON/OFF© ABB Group Main DevicesCommission & WiringGeneral RulerApplication &

Слайд 30General Ruler For Installation
Rulers for IS — RC ON/OFF (Audio

System)
© ABB Group
Looping Connection
Branch Line Connection
Main Devices
Commission & Wiring
General

Ruler
Application & solution


Rulers for IS
Rulers for multi-buildings
Capacity
Distance









“RC-ON” or “RC-OFF”:
In pure audio installations, the terminal resistor must always be deactivated ‘RC OFF'.

General Ruler For InstallationRulers for IS — RC ON/OFF (Audio System)© ABB Group Looping ConnectionBranch Line ConnectionMain

Слайд 31© ABB Group
Rulers for IS — RC ON/OFF (Video

System)
General Ruler For Installation
Main Devices
Commission & Wiring
General Ruler
Application & solution


Rulers

for IS
Rulers for multi-buildings
Capacity
Distance









“RC-ON” or “RC-OFF”:
In video installations or mixed audio and video installations, the terminal resistor must be activated on the last device of the arm ‘RC ON'.

Looping Connection

Branch Line Connection

© ABB Group Rulers for IS — RC ON/OFF (Video System)General Ruler For InstallationMain DevicesCommission & WiringGeneral

Слайд 32© ABB Group
Combined Connection
Rulers for IS — RC ON/OFF

(Audio & Video System)

General Ruler For Installation
Main Devices
Commission & Wiring
General

Ruler
Application & solution


Rulers for IS
Rulers for multi-buildings
Capacity
Distance









© ABB Group Combined ConnectionRulers for IS — RC ON/OFF (Audio & Video System)General Ruler For InstallationMain

Слайд 33General Ruler For Installation
Rulers for Multi-Buildings
© ABB Group
Looping Connection
Main

Devices
Commission & Wiring
General Ruler
Application & solution


Rulers for IS
Rulers for multi-buildings


Capacity
Distance









“RC-ON” or “RC-OFF”:
the terminal resistor must be activated on the last device of the arm ‘RC ON'.

Building 1

Building 2

Building n

Building 3

General Ruler For InstallationRulers for Multi-Buildings© ABB Group Looping ConnectionMain DevicesCommission & WiringGeneral RulerApplication & solutionRulers for

Слайд 34General Ruler For Installation
Rulers for Multi-Buildings
© ABB Group
Branch Line

Connection
Main Devices
Commission & Wiring
General Ruler
Application & solution


Rulers for IS
Rulers for

multi-buildings
Capacity
Distance









“RC-ON” or “RC-OFF”:
the terminal resistor must be activated on the last device of the arm ‘RC ON'.

Building 1

Building 2

Building 4

Building 3

General Ruler For InstallationRulers for Multi-Buildings© ABB Group Branch Line ConnectionMain DevicesCommission & WiringGeneral RulerApplication & solutionRulers

Слайд 35General Ruler For Installation
Capacity
© ABB Group
Main Devices
Commission & Wiring
General

Ruler
Application & solution


Rulers for multi-IS
Rulers for multi-buildings
Capacity
Distance









9 outdoor stations

per building

The system may include:

60 buildings

250 indoor stations per building

9 guard units per building

50 video indoor stations per system controller *
100 audio indoor stations per system controller *

*Remark:
only to the application that one apartments with one indoor station.

General Ruler For InstallationCapacity© ABB Group Main DevicesCommission & WiringGeneral RulerApplication & solutionRulers for multi-ISRulers for multi-buildings

Слайд 36© ABB Group
General Ruler For Installation
Insulated section:

When calculating capacity, all calculations must be based on each

insulated system that is only one system controller is included.
Sum of segment inside one insulated section must be less than 800m.

4 insulated sections are contained in the following example:

© ABB Group General Ruler For InstallationInsulated section:   When calculating capacity, all calculations must be

Слайд 37© ABB Group
General Ruler For Installation
Only Gateway can extend

the distance:
When calculating distance from outdoor station(gate

station) to the farthest indoor station, all calculations must be done separately if multi-gateways are involving in this communication channel

Distance need to be separated into 3 sections in following example.

Remark:
A maximum of 2 Gateways(building gateway/ apartment gateway/ floor gateway) + 2 Gateways(additional power supply mode) can be used in cascade.
( By gateways used in cascade, it means gateway crossed by an outdoor station to indoor station connection)

© ABB Group General Ruler For InstallationOnly Gateway can extend the distance:   When calculating distance

Слайд 38General Ruler For Installation
Capacity
© ABB Group
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!

Precondition:

*Unit: apartment
For example: 50 means 50apartments with 1 indoor station for each apartment;
15 means 15 apartments with 2 indoor stations for each apartment.

General Ruler For InstallationCapacity© ABB Group *The table should be applied for each insulated system, which is

Слайд 39General Ruler For Installation
Capacity
© ABB Group
Precondition:
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:*The table should be applied for each insulated system, which is

Слайд 40General Ruler For Installation
Capacity
© ABB Group
Precondition:
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:*The table should be applied for each insulated system, which is

Слайд 41General Ruler For Installation
Capacity
© ABB Group
Precondition:
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:*The table should be applied for each insulated system, which is

Слайд 42General Ruler For Installation
Capacity
© ABB Group
Precondition:
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:*The table should be applied for each insulated system, which is

Слайд 43General Ruler For Installation
Capacity
© ABB Group
Precondition:
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:*The table should be applied for each insulated system, which is

Слайд 44General Ruler For Installation
Capacity
© ABB Group
Precondition:
For kit and small

building application:
*The table should be applied for each insulated system,

which is only one system controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:For kit and small building application:*The table should be applied for

Слайд 45General Ruler For Installation
Capacity
© ABB Group
Precondition:
*The table should be

applied for each insulated system, which is only one system

controller included.
*If system including several system controllers, using gateway to separate the system into several insulated systems.
*The data is only for reference, final data please refer to user manual!!!!!
General Ruler For InstallationCapacity© ABB Group Precondition:*The table should be applied for each insulated system, which is

Слайд 46© ABB Group
General Ruler For Installation
Capacity
For example:
In the realization

of the systems we must consider the possibility to insert

other components:
one video outdoor distributor = 1 indoor station
one guard unit = 20 indoor stations
© ABB Group General Ruler For InstallationCapacityFor example:In the realization of the systems we must consider the

Слайд 47General Ruler For Installation
Distance -- one building
© ABB Group
Looping

Connection

General Ruler For InstallationDistance -- one building© ABB Group Looping Connection

Слайд 48General Ruler For Installation
Distance -- one building
© ABB Group
Branch

Line Connection

General Ruler For InstallationDistance -- one building© ABB Group Branch Line Connection

Слайд 49© ABB Group
General Ruler For Installation
Distance – residential complexes
Looping

Connection

© ABB Group General Ruler For InstallationDistance – residential complexesLooping Connection

Слайд 50© ABB Group
General Ruler For Installation
Distance – residential complexes
Looping

Connection

© ABB Group General Ruler For InstallationDistance – residential complexesLooping Connection

Слайд 51© ABB Group
General Ruler For Installation
Distance – residential complexes
Looping

Connection

© ABB Group General Ruler For InstallationDistance – residential complexesLooping Connection

Слайд 52General Ruler For Installation
Distance – residential complexes
© ABB Group
Branch

Line Connection

General Ruler For InstallationDistance – residential complexes© ABB Group Branch Line Connection

Слайд 53© ABB Group
Distance – residential complexes
Branch Line Connection
General Ruler

For Installation

© ABB Group Distance – residential complexesBranch Line ConnectionGeneral Ruler For Installation

Слайд 54© ABB Group
Distance – residential complexes
Branch Line Connection
General Ruler

For Installation

© ABB Group Distance – residential complexesBranch Line ConnectionGeneral Ruler For Installation

Слайд 55
Content
© ABB Group
Overview Main Devices
Commission & Wiring
General Ruler

of Installation
Application & Solution

Content© ABB Group Overview Main DevicesCommission & WiringGeneral Ruler of InstallationApplication & Solution

Слайд 56Application and solution
© ABB Group
1. Planning
2. Installation & Wiring
3.

Commission
According to user case :
Choose correct devices ( modules

of outdoor station; Indoor stations; system controller; the system devices which are needed.)
Calculate the system consumption units, distances
Planning the connection (Loop connection; Branch line connection)

Install devices after reading user manuals
Using the prepared wire to wiring the devices together

Configure each device correctly

DONE!

Main Devices
Commission & Wiring
General Ruler
Application & solution














Application and solution© ABB Group 1. Planning2. Installation & Wiring3. CommissionAccording to user case :Choose correct devices

Слайд 57Application and solution
Single-family house, audio/video
© ABB Group
2-wire bus line
Main

Devices
Commission & Wiring
General Ruler
Application & solution


Single-family house, audio/video












Application and solutionSingle-family house, audio/video© ABB Group 2-wire bus lineMain DevicesCommission & WiringGeneral RulerApplication & solutionSingle-family house,

Слайд 58Application and solution
Single-family house, audio/video
© ABB Group June 11, 2013

| Slide ‹#›
Main Devices
Commission & Wiring
General Ruler
Application & solution


Single-family house,

audio/video












Application and solutionSingle-family house, audio/video© ABB Group June 11, 2013 | Slide ‹#›Main DevicesCommission & WiringGeneral RulerApplication

Слайд 59Application and solution
Multi-family house, audio
© ABB Group
M Range
Product Overview
Main

Features
Main Functions
Topology and solution


Multi-family house, audio
2-wire bus line

Application and solutionMulti-family house, audio© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionMulti-family house, audio2-wire bus

Слайд 60Application and solution
Multi-family house, audio
© ABB Group June 11, 2013

| Slide ‹#›
Remark:
Up to 250 audio handsets.
All consumer units required

must be covered by the System Controller.

M Range
Product Overview
Main Features
Main Functions
Topology and solution


Multi-family house, audio

Application and solutionMulti-family house, audio© ABB Group June 11, 2013 | Slide ‹#›Remark:Up to 250 audio handsets.All

Слайд 61Application and solution
Multi-family house, audio/video
© ABB Group
M Range
Product Overview
Main

Features
Main Functions
Topology and solution


Multi-family house, audio/video
2-wire bus line

Application and solutionMulti-family house, audio/video© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionMulti-family house, audio/video2-wire bus

Слайд 62Application and solution
Multi-family house, audio/video
© ABB Group
Remark:
Up to 250

audio & video Indoor Stations.
All consumer units required must be

covered by the System Controller.

100~240V~

M2300

M Range
Product Overview
Main Features
Main Functions
Topology and solution


Multi-family house, audio/video

Application and solutionMulti-family house, audio/video© ABB Group Remark:Up to 250 audio & video Indoor Stations.All consumer units

Слайд 63Application and solution
Multi-indoor stations per apartment, using auxiliary power supply


© ABB Group
M Range
Product Overview
Main Features
Main Functions
Topology and solution


One

family with multi-indoor station

2-wire bus line

Application and solutionMulti-indoor stations per apartment, using auxiliary power supply © ABB Group M RangeProduct OverviewMain FeaturesMain

Слайд 64Application and solution
© ABB Group
100~240V~
M2300
M Range
Product Overview
Main Features
Main Functions
Topology

and solution


One family with multi-indoor station
0
0
100-240V~
M2300
Multi-indoor stations per apartment, using

auxiliary power supply
Application and solution© ABB Group 100~240V~M2300M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionOne family with multi-indoor station00100-240V~M2300Multi-indoor stations

Слайд 65Application and solution
Additional power supply for 2nd-indoor station
© ABB Group


M Range
Product Overview
Main Features
Main Functions
Topology and solution


One family with multi-indoor

station

2-wire bus line

Application and solutionAdditional power supply for 2nd-indoor station© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionOne

Слайд 66Application and solution
One family with multi-indoor station
© ABB Group
100~240V~
100~240V~
M2301
M2300
M

Range
Product Overview
Main Features
Main Functions
Topology and solution


One family with multi-indoor station

Application and solutionOne family with multi-indoor station© ABB Group 100~240V~100~240V~M2301M2300M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionOne family

Слайд 67Application and solution
Commercial object, audio/video
© ABB Group
M Range
Product Overview
Main

Features
Main Functions
Topology and solution


Commercial object, audio/video
2-wire bus line

Application and solutionCommercial object, audio/video© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionCommercial object, audio/video2-wire bus

Слайд 68Application and solution
Commercial object, audio/video
© ABB Group
Remark:
Up to 9

Outdoor Stations
All consumer units required must be covered by the

System Controller.

100~240V~

M2300

M Range
Product Overview
Main Features
Main Functions
Topology and solution


Commercial object, audio/video

Application and solutionCommercial object, audio/video© ABB Group Remark:Up to 9 Outdoor StationsAll consumer units required must be

Слайд 69Application and solution
Guard unit application
© ABB Group
M Range
Product

Overview
Main Features
Main Functions
Topology and solution


Guard unit application
2-wire bus line

Application and solutionGuard unit application © ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionGuard unit application

Слайд 70Application and solution
Guard unit application
© ABB Group
100~240V~
100~240V~
Remark:
Up to

9 Guard for the building, and only one Master is

allowed.
All consumer units required must be covered by the System Controller.

M2301

M2300

M Range
Product Overview
Main Features
Main Functions
Topology and solution


Guard unit application

Application and solutionGuard unit application © ABB Group 100~240V~100~240V~Remark:Up to 9 Guard for the building, and only

Слайд 71Application and solution
Apartment system, with 2nd-confirmed outdoor station
© ABB Group


M Range
Product Overview
Main Features
Main Functions
Topology and solution


Apartment system, with 2nd-confirmed

outdoor station

2-wire bus line

Application and solutionApartment system, with 2nd-confirmed outdoor station© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionApartment

Слайд 72Application and solution
Apartment system, with 2nd-confirmed outdoor station
© ABB Group


100~240V~
0
1
9
9
100~240V~
100~240V~
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Apartment system, with 2nd-confirmed

outdoor station
Application and solutionApartment system, with 2nd-confirmed outdoor station© ABB Group 100~240V~0199100~240V~100~240V~M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionApartment

Слайд 73Application and solution
Floor system, with outdoor station connected for each

floor
© ABB Group
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Floor

system, with outdoor station connected for each floor

2-wire bus line

Application and solutionFloor system, with outdoor station connected for each floor© ABB Group M RangeProduct OverviewMain FeaturesMain

Слайд 74Application and solution
Floor system, with outdoor station connected for each

floor
© ABB Group
Remark:
Up to 250 Indoor Stations.
100~240V~
0
1
9
9
100~240V~
100~240V~
M2300
M2301
M2301
M Range
Product Overview
Main

Features
Main Functions
Topology and solution


Floor system, with outdoor station connected for each floor
Application and solutionFloor system, with outdoor station connected for each floor© ABB Group Remark:Up to 250 Indoor

Слайд 75Application and solution
Auxiliary power supply for the bus
© ABB Group


M Range
Product Overview
Main Features
Main Functions
Topology and solution


Auxiliary power supply for

the bus

2-wire bus line

Application and solutionAuxiliary power supply for the bus© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionAuxiliary

Слайд 76Application and solution
Auxiliary power supply for the bus
© ABB Group


Remark:
Up to 250 Indoor Stations.
100~240V~
0
0
0
0
100~240V~
100~240V~
M2301
M2301
M2300
M Range
Product Overview
Main Features
Main Functions
Topology and

solution


Auxiliary power supply for the bus

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

7” VIS

Application and solutionAuxiliary power supply for the bus© ABB Group Remark:Up to 250 Indoor Stations.100~240V~0000100~240V~100~240V~M2301M2301M2300M RangeProduct OverviewMain

Слайд 77Application and solution
Residential complexes, with looping connection
© ABB Group
M

Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential complexes, with looping connection
2-wire

bus line
Application and solutionResidential complexes, with looping connection© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionResidential complexes,

Слайд 78Application and solution
Residential complexes, with looping connection
© ABB Group
100~240V~
100~240V~
6
0
0
1
100~240V~
Remark:
All

consumer units required must be covered by the System Controller.
M2300
M2300
M2300
M

Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential complexes, with looping connection
Application and solutionResidential complexes, with looping connection© ABB Group 100~240V~100~240V~6001100~240V~Remark:All consumer units required must be covered by

Слайд 79Application and solution
Residential complexes, with branch line connection
© ABB Group


M Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential complexes, with branch

line connection

2-wire bus line

Application and solutionResidential complexes, with branch line connection© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionResidential

Слайд 80Application and solution
Residential complexes, with branch line connection
© ABB Group


100~240V~
100~240V~
100~240V~
0
2
0
1
Remark:
All consumer units required must be covered by the System

Controller.

M Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential complexes, with branch line connection

Application and solutionResidential complexes, with branch line connection© ABB Group 100~240V~100~240V~100~240V~0201Remark:All consumer units required must be covered

Слайд 81Application and solution
Residential complexes with guard unit
© ABB Group
M

Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential complexes with guard unit
2-wire

bus line
Application and solutionResidential complexes with guard unit© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionResidential complexes

Слайд 82Application and solution
Residential complexes with guard unit
© ABB Group
Gate
100~240V~
100~240V~
100~240V~
100~240V~
~
100~240V~
0
1
0
2
M

Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential complexes with guard unit
100~240V~

Application and solutionResidential complexes with guard unit© ABB Group Gate100~240V~100~240V~100~240V~100~240V~~100~240V~0102M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionResidential complexes

Слайд 83Application and solution
Group of villas
© ABB Group
M Range
Product Overview
Main

Features
Main Functions
Topology and solution


Group of villas
2-wire bus line

Application and solutionGroup of villas© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionGroup of villas2-wire bus

Слайд 84Application and solution
Group of villas
© ABB Group
Gate
100~240V~
100~240V~
9
9
0
1
100~240V~
M Range
Product Overview
Main

Features
Main Functions
Topology and solution


Group of villas

Application and solutionGroup of villas© ABB Group Gate100~240V~100~240V~9901100~240V~M RangeProduct OverviewMain FeaturesMain FunctionsTopology and solutionGroup of villas

Слайд 85Application and solution
Residential complexes, with looping connection and long distances


© ABB Group
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential

complexes, with looping connection and long distances

2-wire bus line

Application and solutionResidential complexes, with looping connection and long distances © ABB Group M RangeProduct OverviewMain FeaturesMain

Слайд 86Application and solution
Residential complexes, with looping connection and long distances


© ABB Group
Gate
100~240V~
100~240V~
100~240V~
6
0
0
1
0
0
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential

complexes, with looping connection and long distances
Application and solutionResidential complexes, with looping connection and long distances © ABB Group Gate100~240V~100~240V~100~240V~600100M RangeProduct OverviewMain FeaturesMain

Слайд 87Application and solution
Residential complexes, with branch line connection and long

distances
© ABB Group
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential

complexes, with branch line connection and long distances

2-wire bus line

Application and solutionResidential complexes, with branch line connection and long distances© ABB Group M RangeProduct OverviewMain FeaturesMain

Слайд 88Application and solution
Residential complexes, with branch line connection and long

distances
© ABB Group
Gate
100~240V~
100~240V~
0
2
0
1
0
0
100~240V~
100~240V~
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Residential

complexes, with branch line connection and long distances
Application and solutionResidential complexes, with branch line connection and long distances© ABB Group Gate100~240V~100~240V~020100100~240V~100~240V~M RangeProduct OverviewMain FeaturesMain

Слайд 89Application and solution
Application for more than 250 apartments per building
©

ABB Group
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Application for

more than 250 apartments per building

2-wire bus line

Application and solutionApplication for more than 250 apartments per building© ABB Group M RangeProduct OverviewMain FeaturesMain FunctionsTopology

Слайд 90Application and solution
Application for more than 250 apartments per building
©

ABB Group
0
1
0
0
6
0
100-240V~
100-240V~
100-240V~
Gate
M Range
Product Overview
Main Features
Main Functions
Topology and solution


Application for

more than 250 apartments per building
Application and solutionApplication for more than 250 apartments per building© ABB Group 010060100-240V~100-240V~100-240V~GateM RangeProduct OverviewMain FeaturesMain FunctionsTopology

Слайд 91Application and solution
Legend
© ABB Group
Product Overview
Main Features
Main Functions
Application &

Solution


Legend
Note
Main Entrance
Video Outdoor
System controller
Electronic door opener
7” Video Hands-free
4.3” Video Hands-free
4.3”

Video Handset

Audio Handset

4.3” Video Handset Guard

Mini System controller

Indoor Distributor

Outdoor Distributor

Gateway

CCTV

Light

Side Entrance

Application and solutionLegend© ABB Group Product OverviewMain FeaturesMain FunctionsApplication & SolutionLegendNoteMain EntranceVideo OutdoorSystem controllerElectronic door opener7” Video

Слайд 92© ABB Group

© ABB Group

Обратная связь

Если не удалось найти и скачать доклад-презентацию, Вы можете заказать его на нашем сайте. Мы постараемся найти нужный Вам материал и отправим по электронной почте. Не стесняйтесь обращаться к нам, если у вас возникли вопросы или пожелания:

Email: Нажмите что бы посмотреть 

Что такое TheSlide.ru?

Это сайт презентации, докладов, проектов в PowerPoint. Здесь удобно  хранить и делиться своими презентациями с другими пользователями.


Для правообладателей

Яндекс.Метрика