Разделы презентаций


Diploma theme: Change in the Anti-emergency automatic system as a result of the

North-East-SouthIn 2018 Kegoc finished the Construction of a 500 kV overhead transmission lines which called «North-East-South transit» It allowed to increase the transit potential of the NES in the direction of

Слайды и текст этой презентации

Слайд 1Diploma theme: Change in the Anti-emergency automatic system as a result

of the complication of the Kazakhstan’s NEN scheme.

Done by: Shaimuradov

E.S.
Research supervisor : Bektemirov A.T.

Diploma theme: Change in the Anti-emergency automatic system as a result of the complication of the Kazakhstan’s

Слайд 2North-East-South
In 2018 Kegoc finished the Construction of a 500 kV

overhead transmission lines which called «North-East-South transit»
It allowed to

increase the transit potential of the NES in the direction of North-South of Kazakhstan, to ensure coverage of the electricity needs of railways, energy-intensive facilities of the mining industry, and also to create conditions for the development of renewable energy sources, which is especially important in the concept of transition to a “green economy” that implemented in Kazakhstan, and also to strengthen the connection of the Eastern zone with the unified electric system of Kazakhstan.
North-East-SouthIn 2018 Kegoc finished the Construction of a 500 kV overhead transmission lines which called «North-East-South transit»

Слайд 3Anti-emergency control system

Anti-Emergency control system is designed

to automatically prevent and localize emergency modes in the event

of regulatory disturbances , and it performed :

-in order to prevent disturbances in power system stability
- in order to eliminate asynchronous modes
- prevent unacceptable reduction or increase in frequency, voltage
-prevent unacceptable current loads on electrical equipment
-increase the allowable power flow in the network



Anti-emergency control system   Anti-Emergency control system is designed to automatically prevent and localize emergency modes

Слайд 4Stracture of anti-emergency control system

Stracture of anti-emergency control system

Слайд 5Automation of prevention of violation of stability(АПНУ)
In the I-BEFORE algorithm,

the size of the decision table for cross-sectional flows, as

well as the magnitude of control actions, is automatically determined directly during the operation of the emergency control automation system. In this case, there are two options. According to the first - the calculation is carried out by specialists or coordinating complex, according to the second - directly at the object.
Automation of prevention of violation of stability(АПНУ)In the I-BEFORE algorithm, the size of the decision table for

Слайд 6Why we use method 1-Before ?
Method 2-Before in Centralized emergency

control system when solving problems of APVS(АПНУ)
control redundancy
mode limitation
Method 1-Before

in Centralized emergency c.s.(ЦСПА)
- Efficiency
-possibility of improvement
Why we use method 1-Before ?Method 2-Before in Centralized emergency control system when solving problems of APVS(АПНУ)control

Слайд 7Principal Scheme of South-East-North transient

Principal Scheme of South-East-North transient

Слайд 8Thank you for attention

Thank you for attention

Обратная связь

Если не удалось найти и скачать доклад-презентацию, Вы можете заказать его на нашем сайте. Мы постараемся найти нужный Вам материал и отправим по электронной почте. Не стесняйтесь обращаться к нам, если у вас возникли вопросы или пожелания:

Email: Нажмите что бы посмотреть 

Что такое TheSlide.ru?

Это сайт презентации, докладов, проектов в PowerPoint. Здесь удобно  хранить и делиться своими презентациями с другими пользователями.


Для правообладателей

Яндекс.Метрика